Solar Panel Installation in the UK: Complete Step-by-Step Guide

  • Writer: Jade Fury
    Jade Fury
  • 2 days ago
  • 5 min read
Solar-panel-benifits

Installing solar panels is one of the most effective ways to reduce household energy costs, become less dependent on the grid, and actively lower your carbon footprint. If you’re new to solar, the installation process may seem complex but in reality, it’s fast, efficient, and managed almost entirely by a professional installer.

Most UK solar installations are completed within just a few days, with the full journey from initial enquiry to final activation typically taking 4–8 weeks.

This guide below explains each step, so you’ll know exactly what happens and when.


Step 1: Home Assessment and Personalised Quotation


Your solar journey begins with a detailed assessment of your property. The installer will evaluate whether your roof is suitable and determine the ideal system size based on your home’s energy requirements.

During this stage, the installer will typically:

  • Assess the size, pitch, and condition of your roof

  • Analyse sunlight exposure and potential shading from trees, chimneys, or neighbouring buildings

  • Review your current energy usage to calculate expected demand

  • Recommend a system size (for example, 3 kW, 4 kW, or 5 kW)

Most companies begin with a desk-based satellite survey and follow up with an in-person inspection if needed. This part of the process is usually free, with no obligation to proceed.

You will then receive a full proposal outlining:

  • A tailored quotation

  • Estimated annual electricity generation

  • Potential savings and Smart Export Guarantee (SEG) income

  • Typical payback period and long-term financial projections


Step 2: Custom System Design and Energy Modelling


Once you choose to move forward, the installer will create a bespoke system design engineered for performance on your specific property.

This design stage includes:

  • Optimal panel layout and positioning

  • Selection of the most suitable inverter

  • Advice on whether battery storage would benefit your home

  • Digital performance modelling that predicts expected annual generation (kWh)

Specialist software is used to determine the best angle, direction, panel type, and configuration, ensuring maximum energy output, even in varied UK weather conditions. By the end of this phase, you’ll know exactly what your system will look like and how efficiently it should perform.


Step 3: Permissions, Certification, and Grid Registration


Before installation begins, several regulatory steps must be completed to ensure your system meets national safety and compliance standards. The good news is that installers typically handle all of this on your behalf.

This stage may include:

  • DNO (Distribution Network Operator) notification - Required to connect your solar system to the grid

  • MCS Certification - Confirms that components and installation standards meet UK regulations

  • Planning permission (rarely required) - Typically only applies to listed buildings or properties in conservation areas

Most UK domestic solar systems qualify as permitted development, meaning no planning application is needed.


Step 4: Installation and System Setup


Installation day is when your system is physically fitted to your home. For most UK properties, this takes between one and two days from start to finish.

Work is usually split into two stages:


Roof Installation

  • Scaffolding is erected for safety

  • Mounting brackets are fixed securely to the roof structure

  • Panels are attached to the mounting rails and positioned for optimal sunlight access


Electrical Installation

  • The inverter is installed (commonly in the loft, garage, or utility room)

  • Cables are routed and connected to your consumer unit

  • Smart meter integration may be completed if required for SEG payments


Professional installers ensure:

  • Roof tiles are not damaged

  • All waterproofing points are fully sealed

  • Cables are neatly installed

  • All electrical elements comply with UK safety regulations

Once installed, your system will be structurally and electrically ready for activation.


Step 5: Final Testing, Safety Checks, and Grid Connection


Before your system is switched on, it must be tested to verify safe operation, compliance, and expected performance. The installer will run a series of checks and provide you with essential documents confirming that your system has been installed correctly.

You will be issued with:

  • An MCS Certificate (required to sign up for SEG payments)

  • Confirmation of DNO approval

  • Full installation documentation and guidance for ongoing system use

Once approved, your solar panels are officially permitted to generate electricity and export surplus to the national grid.


Step 6: System Activation, Monitoring, and Performance Tracking


After final sign-off, your solar system is switched on and begins generating clean energy immediately.

Most modern systems include a monitoring platform that allows you to view:

  • Real-time and daily electricity production

  • How much energy you use vs. how much you export

  • Battery storage levels (if applicable)

  • Lifetime environmental and financial savings

Monitoring makes it easy to verify performance, detect any potential issues early, and ensure your system is operating at maximum efficiency all year long.


Optional Step: Registering for Smart Export Guarantee (SEG)


If you want to earn money for surplus electricity generated by your panels, you’ll need to register with an SEG tariff provider. Many homeowners choose to do this once the MCS certificate has been issued.

Registration normally requires:

  • Your MCS certificate

  • Proof of installation

  • Smart meter details

  • Installed system capacity

Major energy suppliers such as Octopus, E.ON, EDF, and British Gas offer SEG tariffs, and applications typically take just a few minutes to complete.

 You might like to read Solar Tax Credits and Incentives for Solar Energy for more information

How Long Does Solar Installation Take?

Below is an average timeline for UK installations. Times may vary slightly depending on roof structure, system size, and DNO processing.

Stage

Typical Duration

Consultation, survey, quote & design

1–2 weeks

Certifications and DNO approval

1–4 weeks

Physical installation

1–3 days

Final activation

Same day

From enquiry to final switch-on, most homeowners complete the full journey in 4–8 weeks.

Ongoing Care, Maintenance, and Inspections

Solar panels are designed to operate with minimal maintenance, even in challenging UK weather. Most require only basic upkeep to maintain long-term efficiency.

Recommended actions include:

  • Light cleaning once or twice a year

  • Occasional checks for shading caused by new trees or nearby extensions

  • Periodic visual inspection of inverters or monitoring alerts

Panels are highly durable and built to withstand rain, wind, frost, and hail. Many also come with long-term warranties, such as:

  • 25–30 year performance guarantees

  • 10–12 year product warranties

With simple care, most systems will continue performing efficiently for several decades.

Solar installation in the UK is a streamlined, fully managed process. Professional installers guide you from initial assessment right through to final activation, ensuring your system is safe, efficient, and built for long-term reliability.

Within just a few days of installation, you can begin generating your own electricity, lowering your bills, increasing energy independence, and contributing to a more sustainable future for decades to come.

If you are interested in solar panel installation for your property then contact Newpower today for your free no obligation quotation.

NEW POWER UK Main Logo (1) copy.png
  • Instagram
  • Facebook

01709 278248

Unit 3 Bridge Court, Rotherham, S60 1RD
UK Registered Company Number - 14496911

refcom-logo-no-background.png

REF1023574

recc-ctsi-code-logo-colour-vertical-Photoroom.png
tesla-energy-installer.jpg
mcs-certified (1)_edited_edited.png

©2024 Newpower Advanced Ltd. All rights reserved

NEWPOWER ADVANCED LTD Company number 14496911 Registered office address 60 Cemetery Road, Wath Upon Dearne, South Yorkshire S63 6HU, is authorised and regulated by the Financial Conduct Authority for credit brokering in conjunction with the sale of goods only FRN 1037988. NEWPOWER ADVANCED LTD are a credit broker and not a lender. We offer credit facilities from a panel of lenders. Credit is subject to status, suitability and affordability.

bottom of page